ChargerInstallerListFind someone who's installed one before.
Codes

EV charger permits and codes

By ChargerInstallerList Editorial·Reviewed August 2026

National model code language is useful context. The adopted edition in your city or county is the document that actually binds the job.

NEC Article 625 is the model starting point

NEC Article 625 covers electric vehicle power transfer systems. AFDC compliance guidance points readers there, then back to local adoption. Amendments and older editions mean two neighboring towns can differ.

Outdoor listing is not optional outdoors

AFDC states outdoor EVSE must be listed/rated for outdoor use. Plan weatherproofing, mounting height, and strain relief with that listing in mind.

Buyer checklist

  • Name the AHJ and permit type in the contract
  • Ask which NEC edition the jurisdiction enforces
  • Keep inspection approval with the final paperwork

Ready to find who to call?

Open your state page or search by ZIP for a distance-sorted list.

Straight answers

Common questions

Do I always need a permit?
Usually yes for a new branch circuit, but your AHJ decides. Ask the installer who pulls the permit and what inspection is required. “No permit needed” without naming the jurisdiction is a red flag.

← All buyer guides